{"id":1840,"date":"2024-02-09T11:37:42","date_gmt":"2024-02-09T11:37:42","guid":{"rendered":"https:\/\/seabrokers.no\/fundamentering\/?post_type=referanser&#038;p=1840"},"modified":"2024-02-19T13:36:40","modified_gmt":"2024-02-19T13:36:40","slug":"the-life-sciences-building-uio-oslo","status":"publish","type":"referanser","link":"https:\/\/seabrokers.no\/fundamentering\/en\/referanser\/the-life-sciences-building-uio-oslo\/","title":{"rendered":"Grauthellertj\u00f8nn bru, Kristiansand"},"content":{"rendered":"<pre id=\"tw-target-text\" class=\"tw-data-text tw-text-large tw-ta\" dir=\"ltr\" data-placeholder=\"Translation\" data-ved=\"2ahUKEwi57Nm6j56EAxVVPxAIHapGBeIQ3ewLegQIBhAU\"><span class=\"Y2IQFc\" lang=\"en\"><strong>Execution<\/strong>\r\nThis work has been carried out in accordance with Norwegian Road Administration code 2\r\nits standard (handbook) for this type of work. This implies\r\ndemands for greater accuracy and precision. In addition, a higher requirement for\r\ndocumentation than when using the pile guidance and other projects.\r\nWe used a Nemek 510, which is a 3-meter drilling rig. We drilled\r\npressure piles with rock footings where all piles were also inclined. The holes remained\r\nwater loss measured and injected under pressure to stop any leaks.\r\nIt was drilled with 273 casing pipes in 3 meter lengths with a drill thrue\r\nsystem so that you can drill further rock holes without pulling up the drill string to\r\nswitch over to mountain crown.\r\nWhen all holes were sealed, we fitted \u00f8200mm steel cores, welded\r\npressure caps and shuddered with approved mixes for this project.\r\nA pressure test was also taken of cubes from the horror mass to ensure good quality\r\nenough quality.<\/span><\/pre>\n","protected":false},"featured_media":1842,"parent":0,"menu_order":1,"template":"","meta":{"_links_to":"","_links_to_target":""},"class_list":["post-1840","referanser","type-referanser","status-publish","hentry","reference-type-drilling"],"acf":{"subtitle":"Referanse","title":"Grauthellertj\u00f8nn bru","text":"The Grautheller crossing marks the start of the new E39 between Kristiansand\r\nand Mandal. Grauthellertj\u00f8nn bridge is a bridge that also marks the start\r\non the planned new parcel through Kristiansand to the east. Our\r\ntask was to lay foundations for the bridge foundations for this bridge.\r\nThis was done with steel core piles into solid rock.","buttons":null,"image":"","video":"","focus_point":"end","style":"dark","type":"full","overlay_opacity":60,"enable_animation":false,"lottie":"","animation_opacity":60},"_links":{"self":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/referanser\/1840","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/referanser"}],"about":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/types\/referanser"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/media\/1842"}],"wp:attachment":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/media?parent=1840"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}