{"id":1866,"date":"2024-02-09T12:12:21","date_gmt":"2024-02-09T12:12:21","guid":{"rendered":"https:\/\/seabrokers.no\/fundamentering\/?post_type=referanser&#038;p=1866"},"modified":"2024-02-19T13:40:30","modified_gmt":"2024-02-19T13:40:30","slug":"tangentoppen-as","status":"publish","type":"referanser","link":"https:\/\/seabrokers.no\/fundamentering\/en\/referanser\/tangentoppen-as\/","title":{"rendered":"Reestablishment of Langbrygga"},"content":{"rendered":"<p>Execution<br \/>\nWe provided a 6 meter rig of the Nemek 1130 type for this<br \/>\nthe project. A temporary embankment was established out on the river&#8217;s edge which<br \/>\nwe disposed of as our work area. This instead of having to do<br \/>\nthe job from a barge. There were both compression and tension piles, and in addition<br \/>\ninclined piles. Since we were working on an embankment, and there were going to be buckling stiffeners<br \/>\n273x8mm due to direct contact with sea\/brackish water, we chose<br \/>\nhere to drill down the knee braces. This is because the rough stone filling<br \/>\nwould have helped to destroy the pipes if we had tried to knock them down<br \/>\nin the traditional way. The casings that were drilled down were off<br \/>\nthe dimension 193mm. Steel cores of the dimensions \u00f8100mm and<br \/>\n\u00f8110mm, was mounted with a truck crane and shivered before we mounted<br \/>\nthe pile hats.<\/p>\n<p>Strict requirements were made for gentle drilling and the use of little air<br \/>\nconsider the terrain and the risk of slipping. This was planned carefully, and<br \/>\nwith great focus and good execution.<\/p>\n","protected":false},"featured_media":1872,"parent":0,"menu_order":1,"template":"","meta":{"_links_to":"","_links_to_target":""},"class_list":["post-1866","referanser","type-referanser","status-publish","hentry","reference-type-drilling"],"acf":{"subtitle":"Referanse","title":"Reestablishment of Langbrygga","text":"Purpose\r\nThe re-establishment of Langbrygga in Skien is a project under the auspices of Grenland\r\nPort where Arne Olav Lund is the main contractor.\r\nThe work involves, among other things, the demolition of approximately 100 meters of the current one\r\nconstruction and establishment of new quay construction. In addition, it must\r\na new VA facility is established behind the quay, and it must be re-established\r\nvarious equipment on the quay.\r\nOur job in this project is to create a good foundation down into solid rock,\r\nand also prevent the pier from slipping in the future as it is relatively\r\nsteep mountain slope in this area with unstable masses.","buttons":null,"image":"","video":"","focus_point":"end","style":"dark","type":"full","overlay_opacity":60,"enable_animation":false,"lottie":"","animation_opacity":60},"_links":{"self":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/referanser\/1866","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/referanser"}],"about":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/types\/referanser"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/media\/1872"}],"wp:attachment":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/media?parent=1866"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}