{"id":1884,"date":"2024-02-09T12:32:57","date_gmt":"2024-02-09T12:32:57","guid":{"rendered":"https:\/\/seabrokers.no\/fundamentering\/?post_type=referanser&#038;p=1884"},"modified":"2024-02-19T13:43:41","modified_gmt":"2024-02-19T13:43:41","slug":"new-extension-to-the-renowned-food-store-jacobs-holtet","status":"publish","type":"referanser","link":"https:\/\/seabrokers.no\/fundamentering\/en\/referanser\/new-extension-to-the-renowned-food-store-jacobs-holtet\/","title":{"rendered":"Jessheim Park"},"content":{"rendered":"<pre id=\"tw-target-text\" class=\"tw-data-text tw-text-large tw-ta\" dir=\"ltr\" data-placeholder=\"Translation\" data-ved=\"2ahUKEwi57Nm6j56EAxVVPxAIHapGBeIQ3ewLegQIBhAU\">Execution\r\nApproximately 1,640 meters in total have been piled with our Junttan PMX22.\r\nThe lengths were ordered in 13 meter lengths of the type P270 T8. Most\r\nthe piles were joined when the average length was around 22-23 metres.\r\nIn the picture you can see that a PDA measurement has been carried out. This in order to\r\nensure that the pile has sufficient and correct support in relation to the design.\r\nIt was also drilled vertically with micropiles (ishebeckstag). Reason\r\nfor this the risk of using concrete piles and the tremors was this\r\nentails next to old concrete pipes that should still be in\r\noperation.\r\n\r\nThe micropiles are drilled down with a Klemm 806-5G rig\r\ntop hammer. At the same time as drilling down, slurry is pumped\r\ninto the hole space in the center of the pile, out of the hole in the pilot and mixes\r\nwith the masses heading down.<\/pre>\n","protected":false},"featured_media":1890,"parent":0,"menu_order":1,"template":"","meta":{"_links_to":"","_links_to_target":""},"class_list":["post-1884","referanser","type-referanser","status-publish","hentry","reference-type-drilling"],"acf":{"subtitle":"Referanse","title":"Jessheim Park","text":"Purpose\r\nJessheim's new district is being developed at Ullkisa's old stadium. It is being built\r\nmodern apartments of all sizes.\r\nOur mission in this project was to ensure a good foundation for the building\r\nwhen using friction piles.","buttons":null,"image":"","video":"","focus_point":"end","style":"dark","type":"full","overlay_opacity":60,"enable_animation":false,"lottie":"","animation_opacity":60},"_links":{"self":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/referanser\/1884","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/referanser"}],"about":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/types\/referanser"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/media\/1890"}],"wp:attachment":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/media?parent=1884"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}