{"id":2428,"date":"2024-10-11T06:40:03","date_gmt":"2024-10-11T06:40:03","guid":{"rendered":"https:\/\/seabrokers.no\/fundamentering\/?post_type=referanser&#038;p=2428"},"modified":"2024-10-11T06:44:18","modified_gmt":"2024-10-11T06:44:18","slug":"1-new-access-to-stavanger-university-hospital-2","status":"publish","type":"referanser","link":"https:\/\/seabrokers.no\/fundamentering\/en\/referanser\/1-new-access-to-stavanger-university-hospital-2\/","title":{"rendered":"Dolo 1 UDK03, Drammen stasjon"},"content":{"rendered":"<p><strong>Purpose<\/strong><\/p>\n<p>The UDK03 project is included in the improvement and<\/p>\n<p>the expansion of Drammen station where both<\/p>\n<p>platforms and railway tracks are to be re-laid. The<\/p>\n<p>local conditions with operational railways,<\/p>\n<p>Drammenselva and various installations in<\/p>\n<p>the ground, makes the project very complex and divides it<\/p>\n<p>up in several phases.<\/p>\n<p>The main works for jet tracking are linked to<\/p>\n<p>temporary footbridge over the river,<\/p>\n<p>support structures for excavation, and<\/p>\n<p>foundation reinforcement to the existing one<\/p>\n<p>the station<\/p>\n<p><strong>Design<\/strong><\/p>\n<p>The jet piles are adapted to the various parts of the project<\/p>\n<p>&#8211; Bridge foundation: Diameter of 1000mm incl<\/p>\n<p>requirement of 7 MPa compressive strength is installed<\/p>\n<p>with reinforcement pipe with \u00d8323mm<\/p>\n<p>&#8211; Water sealing: in combination with sheet piles<\/p>\n<p>\u00d81200-2500mm jet piles installed<\/p>\n<p>&#8211; Foundation reinforcement of existing ones<\/p>\n<p>station construction was carried out with jet piles \u00d81200-<\/p>\n<p>2000mm<\/p>\n<p><strong>Execution<\/strong><\/p>\n<p>The project is still ongoing and only parts of it<\/p>\n<p>the contract work is currently complete. lack of space,<\/p>\n<p>proximity to 3rd parties and exposed environment, have set high demands<\/p>\n<p>for logistics and execution. This applies to one page i<\/p>\n<p>relation to the execution of jet tracking in narrow areas<\/p>\n<p>and great distance between rigging facilities and<\/p>\n<p>drilling point, proximity and risk of settling for<\/p>\n<p>railway lines. But also handling of<\/p>\n<p>The drilling mud has been given a large concentration then<\/p>\n<p>The Drammenselva delimits the work area and sets<\/p>\n<p>the premises for the strictest environmental considerations<\/p>\n","protected":false},"featured_media":2432,"parent":0,"menu_order":1,"template":"","meta":{"_links_to":"","_links_to_target":""},"class_list":["post-2428","referanser","type-referanser","status-publish","hentry","reference-type-dolomiti-refferanser-eng"],"acf":{"subtitle":"Referanse","title":"Dolo 1 UDK03, Drammen stasjon","text":"Jet piles with and without reinforcement","buttons":null,"image":"","video":"","focus_point":"end","style":"dark","type":"full","overlay_opacity":60,"enable_animation":false,"lottie":"","animation_opacity":60},"_links":{"self":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/referanser\/2428","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/referanser"}],"about":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/types\/referanser"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/media\/2432"}],"wp:attachment":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/media?parent=2428"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}