{"id":2483,"date":"2024-10-11T07:14:41","date_gmt":"2024-10-11T07:14:41","guid":{"rendered":"https:\/\/seabrokers.no\/fundamentering\/?post_type=referanser&#038;p=2483"},"modified":"2024-10-11T07:17:01","modified_gmt":"2024-10-11T07:17:01","slug":"dolo-reff-6-kjopesenteret-i-city-lande-jetgrunn","status":"publish","type":"referanser","link":"https:\/\/seabrokers.no\/fundamentering\/en\/referanser\/dolo-reff-6-kjopesenteret-i-city-lande-jetgrunn\/","title":{"rendered":"Dolo Reff 7 Presidentveita i Trondheim  JETGRUNN"},"content":{"rendered":"<p><strong>Basic conditions<\/strong><\/p>\n<p>The terrain on the plot is at elevation 12.0 \u2013 12.5. In the upper part is<\/p>\n<p>the 0.5 \u2013 1.0 m filled sand and gravel. Under the layer with met<\/p>\n<p>sand and gravel is a cultural layer down to elevation 8.9 \u2013 10.1. Furthermore<\/p>\n<p>in depth there is sand and gravel to a great depth. It is expected<\/p>\n<p>transition to silt and clay with depth. The mountain lies deep,<\/p>\n<p>perhaps over 100 m below ground. It is assumed that the groundwater<\/p>\n<p>located at approx. elevation 3.0.<\/p>\n<p><strong>Solution<\/strong><\/p>\n<p>The culture team that is protected gave guidance for<\/p>\n<p>the foundation solutions. A building located on terrain,<\/p>\n<p>without relief, would probably get big sentences.<\/p>\n<p>The original proposal was to base the building on floating foundations<\/p>\n<p>piles (friction piles). Framing of concrete piles through<\/p>\n<p>the culture team would, however, cause damage to the culture team.<\/p>\n<p>The National Archives&#8217; wish was to limit the damage to<\/p>\n<p>cultural layer to a minimum.<\/p>\n<p>In this connection, the possibility of using jet piles was looked at<\/p>\n<p>in combination with casing through the culture layer. This<\/p>\n<p>the solution was chosen and limited the number of piles in relation to<\/p>\n<p>the option of concrete piles, as the capacity of each jet pile is<\/p>\n<p>larger than a concrete pile. By using jet piles, the number<\/p>\n<p>piles reduced from 49 to 37 pcs.<\/p>\n<p>Reinforcing cages were threaded through the casing and down into it<\/p>\n<p>the jetpack after production. After the jet pile was hardened became<\/p>\n<p>the casing cast with structural concrete.<\/p>\n<p>The project was completed without any problems or obstacles.<\/p>\n<p>All piles were set in 8 days. Sentence measurements on<\/p>\n<p>adjacent buildings and on the soil surface\/cultural layer exceeded<\/p>\n<p>never the measurement accuracy of 2 mm. Measurements were taken before,<\/p>\n<p>during and after production.<\/p>\n","protected":false},"featured_media":2487,"parent":0,"menu_order":1,"template":"","meta":{"_links_to":"","_links_to_target":""},"class_list":["post-2483","referanser","type-referanser","status-publish","hentry","reference-type-dolomiti-refferanser-eng"],"acf":{"subtitle":"Referanse","title":" Presidentveita i Trondheim  JETGRUNN","text":"In the quarter Munkhaugveita, Schults gate, Presidentveita i\r\n\r\nTrondheim Peab will build two residential buildings on three levels without\r\n\r\nbasement. Basically, there is a culture layer around three meters deep which\r\n\r\nmust be touched as little as possible.\r\n\r\nAgainst the background of a request from the National Antiquities Authority, it was decided that\r\n\r\nthe buildings were to be founded on jet piles that support\r\n\r\nthe tip. Casing was established through the culture layer.","buttons":null,"image":"","video":"","focus_point":"end","style":"dark","type":"full","overlay_opacity":60,"enable_animation":false,"lottie":"","animation_opacity":60},"_links":{"self":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/referanser\/2483","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/referanser"}],"about":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/types\/referanser"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/media\/2487"}],"wp:attachment":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/media?parent=2483"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}