{"id":2566,"date":"2024-10-11T08:13:55","date_gmt":"2024-10-11T08:13:55","guid":{"rendered":"https:\/\/seabrokers.no\/fundamentering\/?post_type=referanser&#038;p=2566"},"modified":"2024-10-11T08:15:18","modified_gmt":"2024-10-11T08:15:18","slug":"dolo-reff-16-stockholm-ring-sodra-lanken-24-stockholm-jetgrunn","status":"publish","type":"referanser","link":"https:\/\/seabrokers.no\/fundamentering\/en\/referanser\/dolo-reff-16-stockholm-ring-sodra-lanken-24-stockholm-jetgrunn\/","title":{"rendered":"Dolo Reff 17 Sintef Horizon, Trondheim JETGRUNN"},"content":{"rendered":"<p><strong>Orientation about the project<\/strong><\/p>\n<p>The SINTEF Horizon project involves a significant expansion of<\/p>\n<p>SINTEF Energi&#8217;s premises at Sem S\u00e6land vei 11 in Trondheim.<\/p>\n<p>The project includes:<\/p>\n<ol>\n<li>Removal of existing top floor, replaced with 4 new ones<\/li>\n<\/ol>\n<p>floors.<\/p>\n<ol start=\"2\">\n<li>Extension with a glass facade towards Gamle Fysikk and six new ones<\/li>\n<\/ol>\n<p>floors of offices above a glass courtyard.<\/p>\n<ol start=\"3\">\n<li>Establishment of a new lower floor with an auditorium between<\/li>\n<\/ol>\n<p>existing buildings and Old Physics.<\/p>\n<p><strong>Challenges<\/strong><\/p>\n<ol>\n<li>Existing foundations do not have the capacity to handle<\/li>\n<\/ol>\n<p>the additional loads from the new floors, and the ground remains<\/p>\n<p>mainly of clay.<\/p>\n<ol start=\"2\">\n<li>Securing the construction pit must be carried out for both<\/li>\n<\/ol>\n<p>existing building and Gamle Fysikk, a listed building with<\/p>\n<p>daily activity.<\/p>\n<ol start=\"3\">\n<li>Piles are being established near the high-voltage laboratory, which is in operation.<\/li>\n<li>Other activities on campus must not be disturbed.<\/li>\n<\/ol>\n<p><strong>Basic conditions<\/strong><\/p>\n<p>The ground consists of a top layer of sand\/silty sand (4-6 metres) above<\/p>\n<p>clay\/silt down to elevation +30. Below this is a consolidated sand layer<\/p>\n<p>which can carry the loads from the building.<\/p>\n<p><strong>Solution<\/strong><\/p>\n<p>a<\/p>\n<p><strong>Conclusion<\/strong><\/p>\n<p><strong>The jet piles met the requirements for compressive strength, and settlement measurements showed<\/strong><\/p>\n<p><strong>minimal deviations. The project took somewhat longer than planned,<\/strong><\/p>\n<p><strong>mainly due to leaks in the ground and logistical problems on<\/strong><\/p>\n<p><strong>the plot.<\/strong><\/p>\n","protected":false},"featured_media":2570,"parent":0,"menu_order":1,"template":"","meta":{"_links_to":"","_links_to_target":""},"class_list":["post-2566","referanser","type-referanser","status-publish","hentry","reference-type-dolomiti-refferanser-eng"],"acf":{"subtitle":"Referanse","title":"Sintef Horizon, Trondheim JETGRUNN","text":"","buttons":null,"image":"","video":"","focus_point":"end","style":"dark","type":"full","overlay_opacity":60,"enable_animation":false,"lottie":"","animation_opacity":60},"_links":{"self":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/referanser\/2566","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/referanser"}],"about":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/types\/referanser"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/media\/2570"}],"wp:attachment":[{"href":"https:\/\/seabrokers.no\/fundamentering\/en\/wp-json\/wp\/v2\/media?parent=2566"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}