Purpose:

Bærum municipality establishes a new storm water main

through the area of ​​Jar. The area is known for

sensitive quick clay.

Design:

A trench of over 500 m was lime stabilised. It was

set KS piles in ribs and single piles.

Execution:

The area was stabilized with Multicem 50/50 and a

mixing quantity 100 kg/m³. Challenging

project with being long and sometimes narrow

streets in Bærum. The work was done closely with neighbors and

elementary school. In addition, there was quick clay and lots of it

consideration had to be given to the project. The work was done

know the help of a KC rigger.

The work was first carried out under the auspices of Consto Dambygg

  1. Competence, personnel, machines and equipment were

transferred to Seabrokers Fundamentering AS in 2022

and the work was completed.

Scrapbooking

Lokalitet Tjernsrud
UtførendeSeabrokers Dolomiti / Jetgrunn
MetoderLime stabilization
VarighetMai 2021 – Oktober 2023
Omfang
  • KS piles: 11925 pcs., diam.
    Ø600mm, length 7-8 metres.
    A total of 81407 ch with mixing
    and 2,064 tonnes of lime.
Referansekontakt

Tor Tørrissen
Arne Olav Lund AS
Tlf +47 90 61 41 90
t.toerrissen@aol.no