Execution
A well park has become dry using a drilling rig and compressor, 5 wells in total. Wells are drilled with 139 casing pipes down to 1 meter in good rock, cast tightly so that groundwater does not enter, then down to the desired depth. The collector is then set in the desired dimension, filled with liquid/alcohol that will draw heat out of the rock using the heat pump that drives the liquid around the system.
Hoses run from well tops to a sump, and on to a technical room with a butterfly valve
Challenges with not soiling or reducing the outdoor area during execution. Use of rubber mats