Basic conditions

At the top there was 0.5 – 2 meters of filled sand and

gravel. Below this top layer there was 0.5 – 2 metres

firm dry crust clay. Furthermore, it was relatively soft clay

to great depth. The clay was slightly to moderately sensitive.

Existing buildings were founded directly on soles

at the camp. It was assumed that the rock lay in approx. 50 meters

depth.

Solution

The solution was to install a block of jet piles

as basic reinforcement within existing

foundations. Loads were to be transferred to

temporary foundations with stamping on

the jet piles, which would also act as safeguards for

construction pit for excavating the banquette and P-cellar.

The jet piles were established with a 10 degree incline towards

existing foundations. It was carried out

excavation down to two different levels before the jet piles

was installed. A total of 124 were established

jet piles. The piles had diameters of 1.6 meters and

1.8 meters and lengths of between 5 and 8 metres.

LokalitetTrondheim
UtførendeJetgrunn
MetoderRefunding and retaining wall of jet piles
VarighetByggeår 2012
Referansekontakt

Veidekke Entreprenør AS