Execution
A simple energy well has been carried out for a private residence in Oslo, with difficult access. The well is drilled with 139 casing pipes down to 1 meter in good rock, cast tightly so that groundwater does not enter, then down to the desired depth. The collector is then set in the desired dimension, filled with liquid/alcohol that will draw heat out of the rock using the heat pump that drives the liquid around the system.
Hoses run from the top of the well to the inside outer wall, where the plumber takes over connecting this to the heat pump/heating system

LokalitetOslo
UtførendeSeabrokers Well drilling AS
MetoderEnergiwell
Varighet2023