Execution Approximately 1,640 meters in total have been piled with our Junttan PMX22. The lengths were ordered in 13 meter lengths of the type P270 T8. Most the piles were joined when the average length was around 22-23 metres. In the picture you can see that a PDA measurement has been carried out. This in order to ensure that the pile has sufficient and correct support in relation to the design. It was also drilled vertically with micropiles (ishebeckstag). Reason for this the risk of using concrete piles and the tremors was this entails next to old concrete pipes that should still be in operation. The micropiles are drilled down with a Klemm 806-5G rig top hammer. At the same time as drilling down, slurry is pumped into the hole space in the center of the pile, out of the hole in the pilot and mixes with the masses heading down.