Execution It is spun with double needles of AZ12-770 with lengths from 12 to 15 meters. These are vibrated and pushed down using our Liebherr LRB 18. Pillows and inclined braces are installed in stages with excavation since then must be taken gently due to the danger of quick clay in the area. After some months' stay awaiting the installation of the wall element and floor dividers, we then start dismantling both cushions and diagonal braces and consoles that have been attached to lean concrete. It required good planning to remove these inclined braces at 12 meters and with a dimension of 323 in diameter as there were both partition walls and a cover above all these.