Design The terrain in the area must be lowered to make room for new road course. This leads to challenges related to the groundwater. Both water leakage into the construction pit, as well as groundwater lowering in the adjacent residential area must be avoided. For this, a coherent jet pile wall is established where the excavation was in loose masses, and correspondingly a screen injection there the excavation was in the mountains. Execution The jet piles were made as a single row of piles with diameter 2000mm and center distance of 1.5m. High standard of execution ensures good overlap, uniform piles, and a continuous waterproofing jet pile wall. For injection, strategic ones were first carried out water loss measurements. Based on these results, the defined injection parameters. Berghull became drilled with a center distance of 1 meter and injection was carried out in stages and in 2 rounds, with primary and secondary injection.
Referansekontakt
Arbeidsfellesskapet KRUSE
SMITH AS RISA AS